ZLP Suspended Platform

ZLP Series Temporary Suspended Platform

 

The ZLP Suspended Platform is a temporary, electrically driven access system engineered for working at height without traditional scaffolding. Constructed from modular steel or aluminum sections, it provides stable vertical mobility for facade construction, exterior renovation, and routine maintenance. Designed for building contractors, rental fleets, and facade engineers requiring rapid deployment and strict adherence to international safety standards.

 
 
Technical Specifications

 

Model

Rated Load (kg)

Platform Length (m)

Lifting Speed (m/min)

Hoist Type

Steel Wire Rope (mm)

Safety Lock Type

ZLP630

630

2m – 6m (Modular)

9.6

LTD6.3

4 x 31WS + FC - 8.3

LS30 (Anti-tilting)

ZLP800

800

2m – 7.5m (Modular)

9.3

LTD8.0

4 x 31WS + FC - 9.1

LS30 (Anti-tilting)

 

Standard Power Supply: 380V–415V, 3-Phase, 50Hz/60Hz (Customizable for regional site grids).
Counterweight Configuration: Standard cast iron or concrete blocks matched precisely to the rated load capacity to ensure structural equilibrium.
Suspension Mechanism: Adjustable front/rear outreach beams compatible with diverse building parapet profiles.

 

Key Features

Modular Platform Design

Bolted section assemblies (1m, 1.5m, and 2m increments) allow fast fleet reconfiguration to meet varied job-site dimensions.

Integrated Dual Braking

Combines electromagnetic motor braking with centrifugal speed-limiting safety locks that grip the safety rope instantly upon mechanical failure or a 3-degree platform tilt.

Electrical Protection Circuitry

Features built-in current overload cut-offs, phase failure protection, and emergency stop switches on the control box.

Manual Emergency Descent

Equipped with a manual release lever enabling controlled descent during unexpected site power interruptions.

 

Applications
 

High-Rise Construction

Exterior masonry, insulation installation, and structural plastering.

Facade Engineering

Curtain wall installation, structural glazing, and exterior sealing.

Building Maintenance

Exterior wall restoration, sandblasting, high-pressure cleaning, and painting.

Industrial Structures

Inspection, coating, and repair work on silos, bridges, chimneys, and ship hulls.

 

Configuration & Customization

 

 

Material Selection

Hot-dip galvanized steel for heavy-duty corrosion resistance or lightweight aluminum alloy for reduced dead weight.

 

Suspension Variations

Standard parapet clamps, flat roof counterweight frames, or specialized trolley mounting systems.

 

OEM/ODM Adaptation

Tailored voltage specifications, custom platform dimensions, and private-label branding for international distributors and rental companies.

 

 

 

Manufacturing & Quality Control

Automated Fabrication: Structural frames are fabricated using automated robotic CO2 gas-shielded welding, ensuring consistent weld penetration and structural uniformity.


Corrosion Protection: Steel components undergo a hot-dip galvanizing process, achieving a measured zinc coating thickness >= 80 um verified via magnetic thickness meters.


Rigorous Factory Testing:
100% of hoists undergo a 4-hour continuous load test on test benches prior to final assembly.
Safety locks are individually tested to verify instant gripping response under simulated free-fall conditions.


Compliance: Fully certified to EN1808 European standards and CE directives for temporary suspended access equipment.

ZLP800 Suspended Platform

 

Suspended Scaffold

 

Packaging & Delivery

Export-Grade Packaging: Hoists and electrical control boxes are packed in fumigation-free plywood cases; platform sections are bundled securely with steel strapping and protective film.


Port of Loading: Qingdao / Shanghai Port, China.


Lead Time: 10 to 15 business days for standard configurations; 20 to 25 business days for customized orders.


Container Loading Efficiency:
20ft GP Container: Fits approximately 5 to 6 complete sets (including counterweights).
40ft HQ Container: Fits approximately 10 to 12 complete sets.

 

 

fAQ

 

 

Q: What is the maximum lifting height of the ZLP platform?

A: Standard steel wire rope length is supplied at 100 meters, suitable for buildings up to 30 stories. Extended ropes up to 150 meters can be provided upon request.

Q: How does the safety lock function if a primary wire rope snaps?

A: The anti-tilt safety lock operates independently of the hoist. It reacts instantly to abnormal tilting or rope failure, locking mechanically onto the safety wire rope within a stopping distance of <= 100 mm.

Q: What routine maintenance is required on-site?

A: Operators must inspect wire ropes daily for broken strands or dry lubricant, check gear oil levels in the hoist every 500 operating hours, and test emergency stop circuits before every work shift.

Q: Can the platform be operated in adverse weather?

A: Operation must be suspended immediately if wind speeds exceed 10.8 m/s (Wind Force Level 6), or during heavy rain, snow, and electrical storms, in compliance with standard safety protocols.

 

modular-1
Request a Quote

Submit your project details below to receive a direct factory quotation, estimated shipping costs, and technical documentation within 24 hours.
Required Specification Check:
Model Selection (ZLP630 / ZLP800)
Required Platform Length (meters)
Local Voltage Requirement (e.g., 380V/3Ph/50Hz)
Order Quantity & Destination Port
[Button] Submit Inquiry & Get Pricing

We're well-known as one of the leading zlp suspended platform manufacturers and suppliers in China. We warmly welcome you to buy high quality zlp suspended platform at competitive price from our factory. If you have any technical problems, welcome to contact us for the solutions. 7 meter scaffold tower, single point suspended scaffold, stair scaffold platform

whatsapp

Phone

E-mail

Inquiry